Currency USD
Dual String Handling Tools buy in Houma
Buy Dual String Handling Tools
Dual String Handling Tools

Dual String Handling Tools

In stock
Reconfirm the price with seller
Shipping:
Seller
USA, Houma
(View map)
+1(9 
Display phones
Technical characteristics
  • BrandDual
Description
Bilco dual tubing handling tools have provided reliable, efficient service since their introduction to the oil industry in February 1978. These tools were designed for use with cementing or production equipment, and were engineered to safely pull or run two strings of tubing or casing simultaneously.

Design Eliminates Bent Tubing

The Bilco in-line patented elevator design carries the hook load directly in-line under the bail. This design enables one joint of tubing to be pulled or run without fear of bending the tubing by positioning an extremely heavy of a load off center to the load.

Easy and Quick Access to Open Hole

An open hole can be obtained in less than two minutes with the easy removal of one bolt that holds the Bilco split-bowl spider together. Easy access to an open hole is very important when packers, centralizers, hangers and other types of production equipment must be lowered through it. Equipment with ODs to 6-in can be lowered through the spider without necessity of removal of the spider.



The patented Bilco design eliminates the need for the external pipe divider and inner bushings used in older models; saving 45 minutes or more of costly rig time. This feature also and eliminates the potential danger of leg injury during the removal of the bushings.

Heavy Duty Construction

Bilco dual tools are constructed from high strength alloy steel and have been tested to and are rated at 400 tons.

Designed for Easy Operation

The control console for Bilco dual handling tools may be placed directly on the rig floor, allowing easy accessibility to the operator.

Eliminates Accidental Dropping of the String

The Bilco control console for the air operated spider houses two regulators. One regulator controls pressure to the spider and the other controls pressure to the elevator. By regulating air pressure, the slips cannot be accidentally upset after one joint of tubing has been picked up. This feature eliminates costly downtime.

Saves Valuable Rig Time

Three to four hours of rig up and rig down time can be saved per job, through the use of the Bilco dual automatic spider-elevator.

Rated Capacity
ton [metric ton]
Tubing Size
in [mm]
250 [227] 2 3/8-4 1/2 [60.3-114.3]
400 [363] 2 7/8-5 1/2 [73.0-139.7]







Contact the seller
Dual String Handling Tools
Dual String Handling Tools
Shipping method
Compare0
ClearSelected items: 0